Home·Projects

Projects & case studies.

A curated selection from 200+ projects delivered since 1979 — plus three case studies showing how KSE actually works. The full register lives on the Track Record page.

01 · Case studies

How KSE works.

Case study 01 · Live-facility works

Beirut City Center & Waterfront City — ENOVA / MAF

Ongoing mechanical works inside two operating malls since 2013 — a new food-court chiller, duct rectification, air balancing and new VRF systems, documented in the client’s own reference letter.

Middle East Airlines Training Center
Case study 02 · Flagship scale

MEA Training Center

Area
46,500 m² — pilots & cabin crew center
Scope
Plumbing · Fire · Water treatment
NDU Barsa university campus
Case study 03 · Institutional full scope

NDU Barsa

Area
18,335 m² — university campus
Scope
All mechanical services
02 · Flagship projects

Historic proof.

FNB Finance headquarters
Banking & Corporate

FNB Finance HQ

Area
5,000 m² — headquarters
Scope
All mechanical services
Contractor
Barakat Contracting
Consultant
M.J. AZZI & Part.
Dates
2017–2019
Villa Fawaz plant room — insulated piping manifolds, Rabieh
High-end Residential

Villa Fawaz — Rabieh

Area
2,000 m² — private villa
Scope
Plumbing · Fire · Treatment
Contractor
ABNIAH
Consultant
WTA
Dates
2021–2025
Michel El Murr Villa
High-end Residential

Michel El Murr Villa

Area
2,000 m² — private villa
Scope
All mechanical services
Client
Michel El Murr
Consultant
Fouad Hanna office
Dates
2014–2019
03 · From the register

More on the record.

Beirut Heights
Residential Towers — 2 towers, 33 apartments, Ashrafieh · Plumbing · Fire · Treatment · Heating · Marcel Mouawad / MS Partners · A-Consult / Ibrahim Mounayar · 2011–2014
Dbayeh 529
Commercial Offices — 62 offices, 14 floors · All mechanical services · Kallassy Group / Execo · BEPCO · 2014–2016
Property 173 — Ashrafieh
Residential — 13 floors, 18 apartments · All mechanical services · Nasrallah / MS Partners · Batimat / AME (Mehio office) · 2010–2013
Looking for a specific sector or period? The filterable project register — 1979 to 2026 — is on the Track Record page. The complete register document and reference letters are available on request.
04 · In the field

The work up close.

Installations by KSE teams — plant rooms, risers, distribution and finished spaces.

Rooftop chiller plant installation
Chiller plant
HVAC · rooftop installation
Boiler room with three boilers
Boiler plant
HVAC · heating
Air handling unit installation
Air handling
HVAC · ventilation
Pump hall with distribution pumps
Pump hall
Plumbing · pumping systems
Diesel fire-pump set — pump room
Fire protection
Pump room & risers
Sheet-metal ductwork network
Ducting
HVAC · fabrication
Water treatment installation
Water treatment
Specialty systems
Underfloor heating loops
Underfloor heating
HVAC · floor heating loops
Swimming pool mechanical systems
Pools & water features
Plumbing · treatment · heating
Planning a project?

Talk to KSE.

Or call directly: +961 9 266 163